Thursday, September 10, 2009

More framing...the floor joists are in place

Standing in the basement garage/mechanical room...where Alex and Ryan are standing is the theater room. For some reason Alex thinks he needs to sit on the PVC pipe coming up out of the ground for the plumbing, it's just about the right height!










The basement garage on the right
The two bay areas downstairs in the walkout part.


Looking to the north, the walkout basement.
Looking north at all the floor joists that were put on today.
The front corner...laundry and bedroom.
The front porch
The garage has been filled in with p-gravel...ready for drains, inspection and then ready to pour the slab.
Looking to the south from the main level garage.
The guys are working hard and doing a good job!