Wednesday, September 30, 2009

More windows & the roof started

The breezeway between the garage and the house.
Bedroom #3
The breakfast nook
The family room
Master bedroom bay area
some shingles on the front roof


the south side of the house











Tuesday, September 29, 2009

Shingles were delivered ready to be installed

















Working on the bedroom bay area




The breakfast bay area is finished!















Framing on the inside...corner posts in dining room.







Monday, September 28, 2009

Some windows were installed

Some windows on the main level were installed today. The laundry room
Bedroom #2
Dining room
Computer room/sitting room
Master bath
Master bedroom
Working on the bay areas...breakfast nook on the right.


Bay area windows on the front from the outside






Laundry room on left, bedroom #2 on right.




Saturday, September 26, 2009

More roofing

Almost all of the black paper is on and ready for the roofers next week!

The two bay areas in the back need to be stick built versus engineered trusses for the rest of the roof.


South end of the house
West (front) side...front porch area
Front side...north end
Garage



They framed some external walls in the basement on rainy days.
Some HVAC supplies were delivered.
A view from the end of our drive.

Some views from the main road 475 W